The aim of the Design team was the visual and physical reconnection of the city with the sea, which had been de facto undone by the occupation of the coastal front by massive hotels. The volume of the rooms hovers above ground level, while at the same time the common areas are submerged below the road (taking advantage of the altitude difference between the street and the sea), freeing up the view.
A straight route -accessible to everyone- is created which starts from the road, runs through all the levels of the hotel to end, either on the beach or on the viewing bridge/platform and to a relaxing unobstructed panoramic view of the sea.
Stage: Completed
Design: 2017-2018
Year of Construction / Completion: 2018-2021
PHOTOGRAPHS:
Rooms: AGISILAOU & SPYROU PHOTOGRAPHY LTD
Γενικές Φωτογραφίες και Κοινόχρηστοι Χώροι: Maria Efthimioy
Συμπληρωματικές φωτογραφίες Υποδοχής: Thrasivoulos Karagiannis
PROJECT CONTRIBUTORS
Architecture Firm: Constanti Architects – EnaProsEkato L.L.C.
Architects: Constantinos Constanti, Thrasyvoulos Karayiannis, Pavlos Onisiphorou
Designers: Despo Violari, Lambros Kittos
Civil Engineers: G. KOUNTOURIS CIVIL ENGINEERS L.L.C.
Mechanical Engineers: CONENG Consulting Engineers Ltd
Electrical Engineers: Dimitris Liotatis+associates
Interior Design: M.O.B. design Studio
Lighting Study: Archtube | Architectural Lighting and Design
3D Renders: Progressive Technologies | 3D Rendering
Foundation: Concrete piles for soil support and ground slab with piling
Structure: Steel Structure with Steel Deck
Interior Walls: Plaster dry wall with rockwool
Exterior Walls: Plaster dry wall with rockwool internally and fiberwall externally
Floors:
Reception: White ceramic slabs - terrazzo
Exterior Ground Floor: White ceramic slabs – terrazzo antislip
Swimming Pool Floor: Cast pebbled floor - Antislip
Rooms: LVT
Rooms Corridor: Wooven floor Corridor walls: Decorative Coating
Final Construction Cost: 12,000,000 euros
PHOTOGRAPHER
SUPPLIERS
Constructor: Creato Constructions Evagorou Ltd
Steel Structure: Cyprometal LTD
Dry Wall: Christofi Bros
Mechanical Installation: S.B. Red Heating LTD
Electrical Installation: El&D Christou LTD
Lights: Linea Light Group
Carpentry: Tomazou Furnishings Ltd
Water features: LAKO - Lagoudes & Kokis Co Ltd
Reception Furniture: 3Deco Genesis
Ceramic Tiles: MAOURIS OIKOSET | 5 Ayias Paraskevis | 2412 Nicosia
Furniture: Mobhaus, Thiseos & Pentadaktylou 48, 1016, Nicosia, Cyprus(for lobby)